Experience

Decades of Industrial, Technical, and Executive Experience

Executive roles

Leadership across plants, engineering, and technical organizations.

Plant Manager
Operations Manager
Director of Operations
General Manager
Engineering Project Manager
Laboratory and Technical Leader
Technical foundation

Science and engineering backing every engagement.

  • Bachelor of Science in Chemistry
  • Master of Science in Chemistry
  • Graduate-level technical training
  • Electrochemistry
  • Electronics
  • Instrumentation
  • Process control
  • Analytical systems
  • Manufacturing technology
Manufacturing experience

Hands-on across the converting and industrial stack.

  • Rotogravure printing
  • UV flexographic printing
  • Flexible packaging
  • Labels
  • Thin-gauge foil
  • Film manufacturing
  • Extrusion coating
  • Coating
  • Lamination
  • Slitting
  • Bag and pouch converting
  • Shrink sleeves
  • Metallization
  • Mixing systems
  • Analytical laboratories
  • Industrial controls
  • SCADA
  • Quality systems
  • Validation systems
Representative results

Editable case examples across capital, quality, and delivery.

Results are representative and may be anonymized before publication. Not intended to name any former employer without authorization.

Result

Capital Project Delivery

Led a major manufacturing-line and facility-construction project involving approximately 65,000 square feet of new manufacturing space, delivered on schedule and within budget.

Result

Waste Reduction

Reduced manufacturing waste approximately 10 percent through process improvement and operating discipline.

Result

Throughput Improvement

Improved finishing output approximately 20 percent by addressing process constraints and workflow.

Result

Delivery Performance

Improved on-time, in-full performance from approximately 80 percent to 100 percent in one manufacturing operation.

Result

Operational Recovery

Helped improve delivery performance from essentially zero percent to approximately 60 percent during another operational recovery.

Result

Cost Reduction

Developed and implemented a mistake-proofing solution that generated approximately $1 million in annual savings.

Result

Large Capital Programs

Managed capital projects valued as high as approximately $100 million.